 | 
 

Projects - Yukon
DRILLING FOR GOLD IN '09

BREWERY CREEK
- Option to earn 75% by spending $6MM
- Initial $1MM drilling project underway on high grade targets. A two-phase $2.5MM mapping and drilling program is recommended by Simpson (2009) NI 43-101 report
- NI 43-101 compliant indicated resource of 3.98 million tonnes @ 1.135 gpt Au (145,000 ozs), inferred resource of 2.2 million tonnes @ 2.01 gpt Au (143,000 ozs) as estimated by Simpson (2009) using a cut-off grade of 0.50 gpt Au*
- 95% of previous drilling was less than 50m deep, a new drill campaign is underway
- Past producer with water and production licenses in place through 2021
- A current Socio-Economic Accord with Tr'ondek Hwech'in First Nation with respect to the Brewery Creek Project
- Excellent untested sulphide and skarn potential and possible oxide expansion
GOLD DOME (Scheelite Dome)
- Aggressive drilling on multiple targets commenced late July 2009
- 100% controlled, full Class 3 permit
- A 10 km x 3km gold-bismuth soil anomaly in a favourable geological setting with major sourceless placers
ANTIMONY MOUNTAIN
- Diamond drilling commenced early September
- 100% controlled 30 square mile property 25km north of Brewery Creek, approximately 2 km from highway
- Extensive intense gold soil geochemical anomaly at the Golden Wall discovery
CLEAR CREEK
- Project located on trend between the Brewery Creek mine and the Gold Dome project
- Extensive historic placer mining with no known source
- Extensive soil anomalies up to 3,740 ppb Au
EXPLORATION PROJECTS
- Ogopogo (Alaska) and Willoughby (BC) provide a promising pipeline for future growth
|  | 
Exploration & Development

|  |